NEC4: Effective Preparation and Management of the Construction Programme, Paperback/Tim (Irwin Mitchell, UK) Willis

NEC4: Effective Preparation and Management of the Construction Programme, Paperback/Tim (Irwin Mitchell, UK) Willis

Brand / Editură: Emerald Publishing Limited
396.99 RON
Vezi oferta
NEC4: Effective Preparation and Management of the Construction Programme explains the critical role of the programme within the NEC4 suite of contracts, providing insight and guidance into NEC4 contract requirements and good practice in the preparation of planning the works and the programme. Publisher: Emerald Publishing Limited Author(s): Tim (Irwin Mitchell, UK) Willis Number of pages: 140 Publication date: 2025 Dimensions: 171 x 248 x 12 Cover type: Paperback / softback

Noutăți de la aceeași editură